Why the parapet and the cornice come first
The roof edge is the most sensitive part of an attached house, so a roofer starts the scope there.
A parapet or cornice is both a weather barrier and part of the facade. Before a roofer removes any coping or metal, the condition of the masonry is recorded: cracks, loose brick, failed mortar and any metal flashing set into the wall. Those notes matter to the homeowner and, where the house sits in a historic district or is a landmark, to the review that may apply.
Work at the edge also has to keep water out of the wall while it is open. Temporary covers and a sequenced removal keep the masonry dry through the job. The edge is rebuilt with new flashing set into the wall, not with sealant laid on the surface, so the joint sheds water from behind the coping.
Party walls and shared junctions
Where the roof meets a neighbor's wall, the flashing and the cap decide whether water reaches the top floor.
The party wall is often where a rowhouse roof leaks first, because it is the junction that moves with the masonry, and the flashing must tolerate that movement. A new cap is set so it overhangs both faces of the wall and drains outward, and the flashing is set into a reglet cut in the mortar joint rather than laid across the surface.
Neighbors are not part of the contract, but their wall is part of the work. A roofer who gives notice before working near the shared line avoids disputes and leaves the joint in better shape for both houses.
- Counter-flashing set into a cut in the mortar joint
- A cap or coping that overhangs both faces of the wall
- A drip at the outer edge of the parapet
- Written notice to neighbors before the joint is opened
Reading the flat deck and its layers
The deck is read by testing it, not assumed from the surface, because the layers beneath show what was done before.
Once the surfacing is cut through at test points, the layers beneath reveal their history. Some rowhouse roofs carry a sound membrane over an earlier surface, and some carry a deck that has stayed dry because its drainage has always worked. Each layer is logged, its condition is noted, and the decking below is checked for soft or rotten boards.
The decision about what to remove follows from those findings. A roofer does not assume the old layers can be left, and does not assume they must all go. The scope names the condition found, and the homeowner sees that reasoning in writing before the removal starts.
Rebuilding the flat roof with a sound system
A rebuilt rowhouse roof is only as good as its drainage, its edge and its membrane seams.
The deck is cleaned, dried and tapered toward its outlets where the slope allows, so water is carried away rather than held. A cover board is set if the design calls for one, and the membrane is laid, bonded and sealed at every lap, edge and penetration. The edge is finished with metal set into the masonry.
A new roof is only finished when its outlets work. Each drain, scupper or gutter connection is tested with water on the day of completion, so the homeowner has seen the water leave the roof before the crew packs up.